Senior Environmental Projects (Grades 9 - 12)

 

 

Attention

Senior level projects listed in this page with a bold face link have all the details that you need in order to start your experiments. 

Projects listed with regular link, do not have all the details, instead they have a dedicated project advisor that can help you to get up and running with your project in a few weeks. 

For all other project ideas listed here we are not currently offering any information or support.

 

To send a message to your project advisor, click on Questions & Comments. If the project that you are selecting has an active link, click on that to see startup information of that project. If that page is not updated or does not contain necessary information, let us know about your choice so we can enter or update the startup information for the project that you have selected.

 

* If you need any of these projects fast, send us a message so we can expedite that project.
 
 
 .

 

DISPLAY AND EXPERIMENTAL

 
 SV
 
103 - Study of adaptations of city flora to smog 
105 - The effects of crowding (with the same or other species) on a certain plant  [Exp]
106 - Annual variations in the ecology of a body of water 
107 - A study of a shoreline 
110 - A study of the relation between vegetation and insects 
116 - A study of air purification methods   
117 - Efficient methods of breaking down crude oil in seawater 
118 - Experimenting with microbial degradation of petroleum 
119 - Experimenting with biodegradability   
121 - Find an ink that would decompose for recycling paper 
122 - Using solar energy to purify polluted or salt water 
123 - Yeast: A Filtration Agent for Heavy Metals? 


* If you are a member and need any of these projects, send us a message so we can try to expedite that project.

.

 

Best Projects
 
coming soon
coming soon

 

[Exp] = Experimental projects also known as investigatory projects.

[Exp*] = Adapted or modified to be an Experimental projects also known as investigatory projects.

(Quick) = Projects that can generally be completed in one to 7 days if you have access to all the necessary material or equipment.

coming soon* = Projects that are being added in future. Members can request expedition of such projects.